Demurrage applies while the loaded container stays inside the terminal beyond the agreed free time. Detention applies while you keep the container outside the terminal, for example at your warehouse, beyond free time. Both are billed by time and both are avoidable only if the free period and the pickup or return cut-off are confirmed before booking.
Around 68 to 76 cubic metres of usable space depending on the container build, against roughly 58 cubic metres in a 40GP. The extra height only pays off if your cartons can be stacked above about 2.4 metres. Payload is a separate limit set by the carrier and by road weight rules at destination.
Yes. The verified gross mass must be submitted before the carrier cut-off, either by weighing the packed container or by using a documented calculation method approved under the SOLAS rules. An estimated weight that was never verified is not a compliant VGM.
No. A direct sailing removes one handover, but total door-to-door time still depends on documentation cut-off, customs release, chassis availability and the delivery appointment. Ask for the estimate as separate milestones instead of comparing a single transit number.
You can, but you pay for the whole container regardless of how much cargo is inside. It is worth pricing when the LCL total approaches the container cost, when the cargo cannot be handled alongside other consignments, or when the consolidation cycle would miss your selling window.
FCL means booking a dedicated container for a shipment. Compare FCL and LCL using the same cargo, route and delivery scope. There is no universal cargo-volume threshold at which FCL becomes cheaper.
Send carton or pallet dimensions, package count, gross weight and loading requirements. Compare 20GP, 40GP and 40HQ equipment against the actual carrier specifications, payload limits and receiving facilities. Usable loading space depends on packing and stowage; confirm the load plan before booking.
Read our container selection guide for the information to prepare.
Request an itemized quotation. Services are included only when stated in the agreed scope. For a USA shipment, use our FCL DDP quote checklist.
Transit estimates depend on the port pair, carrier schedule, cargo readiness, customs processing and final delivery arrangements. Ask which stages are included and whether the estimate uses working or calendar days. Review warehouse appointments and unloading requirements before dispatch.
Prepare cargo descriptions, a commercial invoice and packing list. Confirm transport documents and any product-specific paperwork with the appointed parties. Disclose batteries, liquids and special handling needs before booking. Send shipment details to LHD for review.
Nominal dimensions are not the same as usable space. Packing pattern, pallet height, door opening and cargo density all reduce what actually fits inside the box.
Payload is limited by the carrier, the container tare weight and the road regulations at destination. A 20GP may be rated well above 20 tonnes at sea, yet US road weight limits frequently cap a loaded 20GP far below that once chassis and tractor weight are counted. Confirm the road-legal load with the trucker before stuffing the container.
Demurrage accrues while the loaded container stays inside the terminal beyond the agreed free time. Detention accrues while you hold the container outside the terminal, for example at your warehouse, beyond free time. Free time is negotiated, not automatic, and it differs between terminal, rail ramp and carrier.
Confirm before booking whether the delivery address needs a liftgate, a residential drop, an appointment window or a forklift on site. These accessorials are normally billed separately and are the most common reason a delivered quote exceeds the original estimate.